Skip to main content
Search MLTPA

August 5: Meadow Trail Connector

Series SponsorsOld New York Deli and Bagel Company, Bleu Handcrafted Foods, Volunteer Eastern Sierra

This Event’s Sponsors: Mammoth Brewing Company and Disabled Sports Eastern Sierra

Project Description: Join Mammoth Brewing Company and Disabled Sports Eastern Sierra for a special day on the Mammoth Lakes Trail System, as we gather for trail work and to celebrate the grand opening of the new “Meadow Trail Connector” – the second new trail from the Sherwin Area Recreation Plan – followed by an official ribbon cutting ceremony at 1 p.m.! 

Meet at the Sherwins Trailhead near the propane tank farm on Sherwin Creek Road and follow the signs for parking, a free bagel breakfast provided by Old New York Deli, safety talk, and work assignments. A free gourmet lunch – brought to you by Volunteer Eastern Sierra and Bleu Handcrafted Foods – will cap off the day of trail work, along with raffle prizes and free giveaways. All ages and abilities are welcome, as are families and clubs! Please arrive dressed for trail work (long pants, sun protection, sturdy close-toed shoes and gloves), and don’t worry if you can’t make it quite at 8:30; we can check you in and send you off to a task in progress just about anytime before 10:30 a.m. Trail Days are made possible by the Town of Mammoth Lakes, Inyo National ForestMammoth Lakes Recreation, and Mammoth’s own Measure R! And thanks to KMMT Radio for airtime to spread the word!

  • When: Saturday, August 5, 8:30 a.m. - 1:30 p.m. / Ribbon Cutting at 1 p.m.
  • Where: Meet at the Sherwins Trailhead near the propane tank farm on Sherwin Creek Road and follow the signs for parking, a free bagel breakfast, safety talk, and work assignments.
  • What: Work efforts will include new Mammoth Lakes Trail System soft surface signage and general trail maintenance.
  • Who: Volunteers of all ages and abilities are welcome! Please dress for trail work: sturdy, close-toed shoes, hat, and long pants. Gloves and tools provided.

E-mail: traildays@mltpa.org

EVENT STATISTICS:

  • 33 Volunteers + 5 Staff
  • 1/4 mile new trail hand-built
  • 2 large bags of trash
  • 1 fire ring dismantled
  • Ribbon cutting to open Meadow Trail Connector!

PHOTOS:

Click here to access the photo gallery!

GRAPHICS:
Click here to download the Event Flyer!